Checklist · People
Joiner, mover, leaver
Access and equipment steps for starting, changing roles, and leaving the organisation.
Owner: HR, IT and the line managerTime: 30 min eachISO 27001 A.6.1ISO 27001 A.5.18ISO 27001 A.6.5ISO 27001 A.8.1
Joiner (before day one)
Mover (role or team change)
Leaver (on the last day, or earlier if needed)
Adjust it to your environment before relying on it. A finished list shows a routine was followed; it does not guarantee nothing was missed. ISO references show where a list helps, not that it satisfies a control.
Ready to move
beyond legacy GRC?
14-day free trial. No credit card. Cloud or on-premises.