Перейти до основного вмісту
Checklist · People

Joiner, mover, leaver

Access and equipment steps for starting, changing roles, and leaving the organisation.

Owner: HR, IT and the line managerTime: 30 min eachISO 27001 A.6.1ISO 27001 A.5.18ISO 27001 A.6.5ISO 27001 A.8.1
0 of 18

Joiner (before day one)

Mover (role or team change)

Leaver (on the last day, or earlier if needed)

Adjust it to your environment before relying on it. A finished list shows a routine was followed; it does not guarantee nothing was missed. ISO references show where a list helps, not that it satisfies a control.

Готові вийти
за межі застарілого GRC?

14 днів безкоштовно. Без кредитної картки. Хмара або on-premises.